When You Fast, Part 3: Did Jesus Say Fasting Was Optional?

The fasters from Scripture read like a “Who’s-Who” of the Bible. Moses (40 days) came down from Mount Sinai with his face glowing. Elijah (40 days) called down fire from heaven. Daniel (21 days) shut the mouths of the lions’ when he was thrown in the lions’ den. And on and on and on.

Read More