Psalm 52:8 Shirt

from $24.00

This t-shirt is soft and lightweight. made of ring-spun cotton with a polyester blend, it's very comfortable and should last you a long time!

• 100% combed and ring-spun cotton (Heather colors contain polyester)

• Fabric weight: 4.2 oz./yd.² (142 g/m²)

• Pre-shrunk fabric

• Side-seamed construction

Color:
Size:

This t-shirt is soft and lightweight. made of ring-spun cotton with a polyester blend, it's very comfortable and should last you a long time!

• 100% combed and ring-spun cotton (Heather colors contain polyester)

• Fabric weight: 4.2 oz./yd.² (142 g/m²)

• Pre-shrunk fabric

• Side-seamed construction