The Psalms Project Light Zip Up Hoodie

from $55.00
For when you get chilly on a summer evening by the lake, or simply need something comfy to throw on, this lightweight unisex zip hoodie with a modern fit, hood, front zip, and a kangaroo pocket is the way to go.

• 50% polyester, 25% airlume combed ring-spun cotton, 25% rayon
• Fabric weight 5.6 oz/yd² (189.9 g/m²)
• Unisex fit (men may want to order a size up for a looser fit)
• Side-seamed construction
• Hooded
• Kangaroo pocket
• Blank product sourced from Nicaragua, Honduras, Guatemala, or the US
Color:
Size:
For when you get chilly on a summer evening by the lake, or simply need something comfy to throw on, this lightweight unisex zip hoodie with a modern fit, hood, front zip, and a kangaroo pocket is the way to go.

• 50% polyester, 25% airlume combed ring-spun cotton, 25% rayon
• Fabric weight 5.6 oz/yd² (189.9 g/m²)
• Unisex fit (men may want to order a size up for a looser fit)
• Side-seamed construction
• Hooded
• Kangaroo pocket
• Blank product sourced from Nicaragua, Honduras, Guatemala, or the US